Cost of Downtime Calculator

h
h
h
Costs (blank counts as $0)
$ / h down
$
$
$

Result

Cost of downtime over 8,760 h
—
Expected failures
—
Total downtime
—
Production loss
—
Labor, parts and penalties
—
Cost per failure
—
Availability
—
Working

Failures = period ÷ MTBF

Cost = downtime hours × loss per hour + failures × cost per repair

Assumes failures arrive at the average rate and every failure takes the mean repair time.

ReliabilityCalc