8,760 h is one year of continuous running.
Identical parts that draw on the same spares.
Demand = failure rate × period × parts in service
Spares = smallest k with P(failures ≤ k) ≥ target
Assumes failures follow a Poisson process (constant failure rate) and failed parts are not repaired within the period.